HOME
California
- San Francisco County

COMMUNITY CATEGORIES
Class Reunion Announcements
County or City Guides
Religous Organizations
NonProfit Organizations
School Pages
Government Pages
Personal or Family Pages
Local Geneology Sites

CLASSIFIEDS
Items For Sale
Vehicles For Sale
Items Wanted
Properties For Rent or Lease
Homes For Sale by Owner
Homes For Sale by Agent

BUSINESS CATEGORIES
Agriculture and Animals
Arts, Crafts, Antiques
Automobile and Truck Services
Business Opportunities
Children and Child Care
Computers and Internet
Construction and Home Repair
Entertainment and Leisure
Financial and Insurance
Health and Personal Care
Home Services
News and Media
Professional Services
Real Estate Services
Restaurants and Lodging
Retail, Wholesale Mechandisers
Sports and Fitness
Travel and Lodging
Miscellaneous

Items For Sale
  • Machinery

    Glass Bottle Beer Filling Machine 1372 ERROR: No record of payment. Why did you add a falsified confirmation number?
    Contact admin to correct misunderstanding. 706-335-3841
    Leyu Town Zhangjiagang City JiangSu China
    Suzhou
    86-512-58650898
    E-mail: JASONWan
    http://www.filltechbeveragemachinery.com

    Our specialties:



  • Glass bottle beer filling machineWHOLE UNIT PHOTO FOR REFThe equipment is used in production of beer packed in glass bottles. Rinsing,Website:.filltechbeveragemachinery.com, Filling and capping are integrated in one machine.The bottle enters into the rinsing part of three-in-one machine through belt conveyor. The gripper installed on the rotary disk catches bottle and turns it over 180 degrees and makes the bottleneck face ground. In the special rinsing area, the nozzle on the gripper sprays water to rinse bottle in wall. The bottle that enters into the filler is switched by body holding plate. The filling valve acted by the cam can realize up and down. It adopts balanced pressure filling way. The filling valve opens and begins filling when the inner bottle pressure is balanced with inside liquid tank, the filling valve move up and leave the bottleneck when it finishes filling.The full bottle is transferred to the capping part through hold body transition poking wheel. The stop screwing knife holds the bottle neck, keeps bottle upright not rotating. The crown capping head keeps in revolution and autorotation. It can finish a whole capping course including catching, pressing, discharging through the action of the cam. The full bottle is transferred to bottle outlet conveyor to the next process through poking wheel.The whole machine is enclosed with windows, the height of enclosed window is higher than the peak of the 3 in 1 machine, in the bottom of the enclosed window has return air outletThe whole machine is controlled by PLC with touch-screen as the human-machine interface. The amount of the drinks in the storage tank can be controlled automatically. The filling and capping will be stopped automatically when there is no bottle. When bottles are cramped wrongly or when caps are not available, the machine can be stopped automatically.The frequency changing technology is used to adjust the operation speed sleeplessly. The production capacity can be displayed digitally and can be adjusted conveniently.Rinsing partFilling partCapping partElectrical apparatus:TransducerFuLing-TaiwanFL-4KTouch screenEasyview-TaiWanMT6070PLCMitsubishiFXIS-20MRStabilized voltage supplyMingWei-TaiWanS-35-24ContactorDelixiCJX2-0910Approach switchAutonicsPR18-8DNAir switch  Delixi  3P-D20ModelBCGFCapacity(B/H)(500ml)2000-10000BPHBottle sizeNeck:φ20-50mm;Height:150-320mmFilling precision< /-1MMAir pressure0.4MpaAir consumption (m³/min)0.3Quality assuranceWe guarantee the goods offered are brand-new, not used, with latest design and suitable material made, and we guarantee the specification of the equipment is consonance with the contract.We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.Our factory

    Business Location:
    [ Yahoo! Maps ]


  • EDIT THIS LISTING
    Pass Key: